From Heap to Herbie

On day one we started some of the rough body work, removed and reinstalled the hub cap clips on the backside of the wheels for reversed wheels, installed new wheel cylinders, and stuffed the motor in.
On day two we got the motor running, stripped the dash, finished the wheels and prepped them for paint. Once that was done we bled the brakes and watched the painter do what he does best, take a break.
Day three, more sanding.
Day four, more sanding, prime and seal.
Day five it got color, interior, stripes, glass, tires and wheels.
Day six it's done!  It is off the a local theater for the premiere of the new Herbie movie,Herbie Fully Loaded.
After spending time at the movie, it hung out at a local grocery store for the release of the DVD.